3.84kWp Solar Photovoltaic Installation in Keig, Alford, Aberdeenshire
Mr Fleming of Keig, Alford in Aberdeenshire contacted us in relation to his Solar Photovoltaic requirements. After completing our site survey and discussing possible systems, Mr Fleming decided that we should install a 3.84kWp system on an East/West aspect. In order to achieve the highest yield from this system, we installed a 1.92kWp system on both the East and West aspects and convert the DC to AC via an SMA 4000TL-20 Inverter, utilising the Inverters Maximum Power Point Tracking (MPPT) Tracking system.


How does Solar PV Work
Latest News
- Ofgem confirm New Feed-in Tariff rate for Solar PV set at 45.4p
- DECC announces Energy Performance Certificate (EPC) requirement
- WRITTEN MINISTERIAL STATEMENT BY CHRIS HUHNE ON FEED-IN TARRIFS
- DECC loses feed-in tariff appeal
- Huhne Announces new Feed-in Tariffs and cut-off date
- Will DECC be granted an appeal
















